Charging rates continue to climb as more electric vehicles (EVs) move to 800-V architectures, but many sites are limited by how much power the local grid can deliver.
In this episode of EV Talk, Michelle Froese, senior editor with EV Engineering & Infrastructure, speaks with Michael D. Farkas, founder and CEO of NextNRG, about how charging sites should be engineered as power requirements grow. He discusses how onsite battery storage can reduce peak grid demand and why that storage should be sized to a fleet’s charging profile.
The conversation also covers how fleet sites differ from public charging and the potential role of bidirectional and wireless technologies in future EV infrastructure.
Prefer to read the interview? A lightly edited written Q&A is available here.
Listen to the episode below…
Filed Under: Charging, FAQs, Featured Contributions, Vehicle-to-Grid (V2G), Wireless charging
