EV Engineering & Infrastructure

  • News
  • Articles
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • R&D
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe

US federal customers order solar-powered ARC EV-charging infrastructure

By Michelle Froese | February 14, 2024

Beam Global, a provider of innovative and sustainable infrastructure solutions for the electrification of transportation and energy security, announced that six federal customers have placed first-time orders.

The orders are for solar-powered EV ARC EV-charging infrastructure products, which are off-grid, generate and store their own clean electricity, and are deployed with no electrical work, construction, or utility bills — reducing the federal government’s costs through avoided construction, electrical upgrades, operational disruptions, and ongoing utility bills.

The systems can continue to charge EVs during blackouts and most include the optional Emergency Power Panel that can provide vital electricity to first responders during disasters, emergencies and power outages.

The new federal customers, most of which are receiving numerous sustainable EV ARC charging systems powered 100% by renewable energy, are:

  • Defense Media Activity (DMA)
  • Food and Drug Administration (FDA)
  • Missile Defense Agency (MDA)
  • National Park Service (NPS)
  • Small Business Administration (SBA)
  • United Cleanup Oak Ridge (UCOR, federal contractor)

The EV ARC systems were purchased through the General Services Administration (GSA) Multiple Award Schedule (MAS) Contract Number 47QSWA21D0006 and the GSA Federal Blanket Purchase Agreement (BPA) for Electric Vehicle Supply Equipment Contract Number 47QMCA22A0004, contracts that simplify the federal procurement process and ensure best pricing.

“Disaster preparedness and energy resiliency are fast becoming national security level imperatives. We agree with the goal to have 25% of EV charging infrastructure be off-grid, locally generated, locally stored, and locally delivered, powered by 100% renewable energy,” said Desmond Wheatley, CEO of Beam Global. “We expect to continue to deepen and expand our government business in the U.S. and globally.”

The federal fleet is comprised of approximately 657,500 vehicles. Executive Order 14057 with its accompanying Federal Sustainability Plan calls for 100% zero-emission vehicle acquisitions by 2035, including 100% light-duty acquisitions by 2027. This is prioritizing and accelerating a Federal Clean Electricity and Vehicle Procurement Strategy, calling for clean and zero emissions vehicles (ZEVs) for federal, state, local and tribal government fleets, including vehicles of the United States Postal Service.

In addition to the GSA-MAS and GSA-BPA contracts which simplify the federal procurement process and ensure best pricing, Beam Global products are on GSA’s Disaster Purchasing Program which allows state and local government entities to buy directly from GSA-MAS Contract Number 47QSWA21D0006 at the federal discounted price to facilitate disaster preparation, response, or major disaster recovery.

You Might Also Like


Filed Under: Charging, Technology News
Tagged With: beamglobal
 

Next Article

← Previous Article
Next Article →


 
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EV professionals.

Featured Contributions

  • What role do thermal interface materials (TIMs) play in EV battery systems?
  • How evolving demands are driving innovations in EV battery safety and materials
  • How large EV battery packs can be safely recycled without disassembly
  • Changing from traditional powertrains to electrified machines requires optimizing the hydraulic system components to reduce energy consumption and extend vehicle range. What factors impact electric vehicle system design?
  • How to safely detect minute physical Li-ion battery flaws
More Featured Contributions

EE TECH TOOLBOX

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

Learning Center

EE Learning Center
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Sponsored Content

  • Converting custom materials for EV applications
  • Advantech Powers Versatile Electric Vehicle Charging Systems

EV Training Days

ev
EV Engineering & Infrastructure
  • 5G Technology
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • Design Fast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer’s Garage
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search EV Engineering & Infrastructure

  • News
  • Articles
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • R&D
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe