EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe

New 400-kW fast chargers planned for Vermont’s highest-power public EV site

By Puja Mitra | December 15, 2025

XCharge North America (XCharge NA), the North American subsidiary of XCHG Limited, announced that Cellerate Power has selected its electric vehicle (EV) fast-charging and battery-integrated equipment for what is planned to be Vermont’s fastest public charging site.

The project is intended to support growing EV adoption in the state by adding higher power charging capacity in a rural corridor.

XCharge NA C7 ultra-fast chargers will provide up to 400-kW charging power, a higher output than other nearby public stations and around two to three times the power level of many existing fast chargers.

With NACS and CCS connectors available, the site is designed to serve most EV models currently on the road. The nearest alternative site, about 30 minutes away, offers 150-kW charging for CCS-equipped vehicles.

The C7 units include 21.5 inch screens that Cellerate Power plans to use for driver information and local content. The partners state that the site is intended to improve the charging experience, support local businesses and contribute to Vermont’s plans to increase EV use.

The site, operated by Cellerate Power in Winhall, VT, opened to the public in late October 2025.

 

You might also like


Filed Under: Charging, Technology News
Tagged With: charging, xcharge
 

Next Article

← Previous Article
Next Article →


 
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EV professionals.

Tech Spotlight

  • Why deterministic testing matters in high-voltage EV systems
  • Inductive charging is moving from roadways to driveways
More Tech Spotlight

Featured Contributions

  • Q&A: How to keep high-power EV charging reliable under grid constraints
  • How AI Is accelerating atomistic simulation for EV battery materials
  • Q&A: Addressing engineering challenges in high-voltage EV power architectures
  • What is the role of engineering coatings in EVs?
  • Part II: Why it’s important to be wary of “platform” and “modular” architectures
More Featured Contributions

EV TECH TOOLBOX

“ee
Explore the EV Engineering Tech Toolboxes: a collection of high-impact articles that break down the latest EV design trends and technologies. Download to stay aligned with today’s evolving EV design challenges.

Learning Center

EE Learning Center

Sponsored Content

  • Converting custom materials for EV applications
  • Advantech Powers Versatile Electric Vehicle Charging Systems

EV Training Days

ev
Q&A
EV Engineering & Infrastructure
  • 5G Technology
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer’s Garage
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • Contact Us

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe