EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe

High-voltage battery disconnect moves from mechanical to solid-state switching

By Michelle Froese | August 18, 2026

Munich Electrification has introduced a solid-state battery disconnect unit for high-voltage systems in electric commercial vehicles.

ME Solid-State Relay is a solid-state battery disconnect unit for high-voltage systems in commercial vehicles.

The Solid-State Relay (ME SSR) serves as a central high-voltage switch between the battery and the vehicle drivetrain. It connects the battery during operation and disconnects it when the vehicle is parked, serviced, or experiences a fault.

The device replaces conventional mechanical contactors and pyrotechnic fuses with solid-state switching. Munich Electrification says the design is intended for the high duty cycles and vibration levels associated with electric trucks and buses.

The ME SSR switches high-voltage circuits in under five microseconds and operates without mechanical contacts. The solid-state design eliminates contact wear and arcing while allowing the protection system to reset after a fault rather than requiring replacement of a single-use fuse.

The device also supports configurable protection and self-testing functions intended to identify latent faults within the high-voltage system.

Two versions are available. The standalone ME SSR is designed for integration into existing battery disconnect units (BDUs). A second version, the ME SSR Next, combines switching and sensor functions in a single module for new vehicle platforms and BDU consolidation.

Munich Electrification says the integrated architecture can reduce the number of components and interfaces required within the battery disconnect system.

The company is expanding its existing battery-management and sensing portfolio with the new high-voltage switching technology. Its current systems include cell monitoring, current and voltage measurement, and battery disconnect functions for commercial vehicle applications.

Munich Electrification will showcase the ME SSR at IAA Transportation 2026 in Hanover, Germany, from September 15 to 20, 2026.

 

You might also like


Filed Under: Batteries, Technology News
Tagged With: batteries, munichelectrification, solidstatebatteries
 

Next Article

← Previous Article
Next Article →


 
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EV professionals.

Tech Spotlight

  • Why high-power EV charging is pushing control integration into one ECU
  • Designing safety into the cell: The case for system-level solid-state batteries
More Tech Spotlight

Featured Contributions

  • How do two-level and three-level inverter topologies compare in EVs?
  • Inside the development of the Megawatt Charging Standard
  • How does fault-tolerant control keep an EV operating after a sensor failure?
  • Q&A: How EV architectures are changing high-speed connectivity
  • How to catch EV faults before they become failures
More Featured Contributions

EV TECH TOOLBOX

“ee
Explore the EV Engineering Tech Toolboxes: a collection of high-impact articles that break down the latest EV design trends and technologies. Download to stay aligned with today’s evolving EV design challenges.

Learning Center

EE Learning Center

Sponsored Content

  • Converting custom materials for EV applications
  • Advantech Powers Versatile Electric Vehicle Charging Systems

EV Training Days

ev
Q&A
EV Engineering & Infrastructure
  • 5G Technology
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer’s Garage
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • Contact Us

Copyright © 2026 Arrowfly LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Arrowfly
Privacy Policy | Advertising | About Us

Search EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe