EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe

ForeFront Power wins Sourcewell contract for fleet EV charging

By Puja Mitra | December 4, 2025

ForeFront Power has been awarded a Sourcewell cooperative purchasing contract to provide fleet electrification design and installation services and Charging as a Service solutions for US fleets.

The contract supports agencies planning or expanding electric vehicle (EV) infrastructure by offering a pre-approved route to procure charging projects.

Sourcewell’s cooperative purchasing model lets public agencies such as schools, municipalities, and transit agencies buy from vendors that have already gone through a competitive solicitation process.

Agencies can register with Sourcewell and purchase through the existing contract instead of running their own RFP, which can shorten timelines and provide access to pre-negotiated pricing.

ForeFront Power develops solar, storage and related infrastructure for public sector sites. The company reports more than 15 years of experience and 1,900 projects, totaling 1.6 gigawatt-dc across locations, such as transportation and fleet yards, airports, water treatment plants and school districts.

 

You might also like


Filed Under: Charging, Technology News
Tagged With: forefrontpower, Sourcewell
 

Next Article

← Previous Article
Next Article →


 
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EV professionals.

Tech Spotlight

  • Why deterministic testing matters in high-voltage EV systems
  • Inductive charging is moving from roadways to driveways
More Tech Spotlight

Featured Contributions

  • How AI Is accelerating atomistic simulation for EV battery materials
  • Q&A: Addressing engineering challenges in high-voltage EV power architectures
  • What is the role of engineering coatings in EVs?
  • Part II: Why it’s important to be wary of “platform” and “modular” architectures
  • Q&A: How EV constraints are reshaping software-defined vehicle architectures
More Featured Contributions

EV TECH TOOLBOX

“ee
Explore the EV Engineering Tech Toolboxes: a collection of high-impact articles that break down the latest EV design trends and technologies. Download to stay aligned with today’s evolving EV design challenges.

Learning Center

EE Learning Center

Sponsored Content

  • Converting custom materials for EV applications
  • Advantech Powers Versatile Electric Vehicle Charging Systems

EV Training Days

ev
Q&A
EV Engineering & Infrastructure
  • 5G Technology
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer’s Garage
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • Contact Us

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search EV Engineering & Infrastructure

  • News
  • Articles
    • Q&As
    • Tech Spotlight
  • Batteries
  • Charging
    • Wireless Charging
    • Vehicle-to-Grid (V2G)
  • Electrification
  • Testing and Safety
  • Learn
    • Learning Center
    • Tech Toolboxes
    • Webinars
  • Resources
    • Digital Editions
    • Diversity & Inclusion
    • Voices
  • Advertise
  • Subscribe