Arcadis, a global design and consultancy organization for natural and built assets, announced the completion of bp‘s latest high-speed electric vehicle (EV) charging site at the company’s North American headquarters in Houston, Texas.
The new bp pulse station is the first bp pulse branded Gigahub in the US for their EV charging business.
Arcadis delivered program and construction management for the installation of 24 high-speed charge points at bp’s Houston campus. Twelve Tritium 150-kW dc fast chargers were installed at the site and configured so any EV can charge at the new facility. Parking canopies designed to support a solar PV system may be added in the future.
The site is designed to accommodate potential expansion with additional chargers as needed, restrooms, a lounge, and a convenience store.
The new EV charging facility will provide increased capacity for electric vehicle charging across greater Houston, making EV ownership more convenient and helping to reduce driver hesitation to make the switch from gas and diesel vehicles to full electric vehicles. The new charging Gigahub is a critical addition to the City of Houston that is seeing a rapidly growing number of electric vehicles in the city.
“The opening of our first bp pulse Gigahub is a major step in bp pulse’s plans to build out a national EV charging network. EV drivers need access to reliable, fast, on-the-go charging to enable an exceptional customer experience,” said Sujay Sharma, CEO, bp pulse Americas. “Working with leaders in the space, like Arcadis, is allowing us to deliver the charging experience EV drivers need in Houston and beyond.”
bp unveiled the new charging Gigahub during the CERAWeek by S&P Global Conference. The facility is now open to the public.
You may also like:
Filed Under: Charging, Technology News