EV Realty has opened a multi-fleet truck charging hub in San Bernardino, California, deploying 76 high-power charging ports with a total site capacity of 9 MW. The site is designed to support more than 200 medium and heavy-duty electric trucks per day, reflecting the increasing scale requirements of freight electrification.
The installation includes a combination of CCS charging ports and Megawatt Charging System (MCS) interfaces, enabling compatibility with current commercial electric vehicle (EV) platforms while supporting next-generation high-power charging for long-haul applications.
Charging hardware from Kempower is rated for up to 500 kW via CCS and up to 1.2 MW through MCS, aligning with emerging requirements for reduced dwell times and higher energy throughput in fleet operations.
At this power level and charger density, site-level electrical design becomes a primary consideration, with high simultaneous demand requiring coordinated load balancing and distribution across charging assets. Systems of this scale are typically designed to optimize available grid capacity while maintaining consistent power delivery under varying utilization conditions.
Software platforms from Synop are used to manage reservations, monitor energy usage, and provide fleet-level insights into cost, range, and efficiency. These tools support scheduling and energy allocation across multiple vehicles, which becomes increasingly important in shared, multi-fleet environments.
The site is located near the San Bernardino Intermodal Facility and major freight corridors, with access to existing grid capacity supporting accelerated deployment timelines. Designed to serve multiple fleets on shared infrastructure, the hub reflects a shift toward higher utilization charging models that align charging availability with freight movement patterns and depot constraints.
Filed Under: Charging, Technology News